In the early 80's, Robert Crain, a well-known engineer in the condo construction defect world, was asked by HUD to opine on the anticipated useful life of condominium buildings built in Florida. His conclusion was 50 years. Especially for a number of beach-front condos built in the 1970's, engineer Crain seems to have predicted well. The definition...